{"id":80,"date":"2005-03-04T22:13:59","date_gmt":"2005-03-05T05:13:59","guid":{"rendered":"\/?p=80"},"modified":"2005-04-06T16:04:20","modified_gmt":"2005-04-06T23:04:20","slug":"trackwork-on-lower-level","status":"publish","type":"post","link":"https:\/\/www.port-kelsey.com\/?p=80","title":{"rendered":"Trackwork on lower level"},"content":{"rendered":"<p><strong>Pushing the mainline through!<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.port-kelsey.com\/pkimages\/New-section---wide-view_1.jpg\" alt=\"New-section---wide-view_1.jpg\" align=\"baseline\" width=\"475\" height=\"356\" border=\"1\" \/><\/p>\n<p>With the top level complete, I am now ready to focus on the lower deck, and the completion of the mainline!  I am hoping to have the golden spike (OK, the golden solder joint) done before our annual <a href=\"http:\/\/www.handlaidtrack.com\/port-kelsey\/index.php?cat=12\">Doubleheaders layout tour<\/a>, which is coming up in a few weeks.<\/p>\n<p><!--more--><\/p>\n<p>Thought I would post a few progress pictures of the new trackwork, which includes a nifty #6 double crossover&#8230;.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.port-kelsey.com\/pkimages\/6-Double-crossover_1.jpg\" alt=\"6-Double-crossover_1.jpg\" align=\"baseline\" width=\"475\" height=\"567\" border=\"1\" \/><\/p>\n<p>The lower deck should be fun to operate, lots of interesting switching, but hopefully it will not get boring to quickly.  I am trying to keep this fairly simple down here, just some sidings and a good sized passing track.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.port-kelsey.com\/pkimages\/New-section_1.jpg\" alt=\"New-section_1.jpg\" align=\"baseline\" width=\"425\" height=\"567\" border=\"1\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.port-kelsey.com\/pkimages\/Through-the-hole-in-the-sky.jpg\" alt=\"Through-the-hole-in-the-sky.jpg\" align=\"baseline\" width=\"425\" height=\"319\" border=\"1\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.port-kelsey.com\/pkimages\/Turnout-in-front-of-crossov.jpg\" alt=\"Turnout-in-front-of-crossov.jpg.jpg\" align=\"baseline\" width=\"425\" height=\"567\" border=\"1\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pushing the mainline through! With the top level complete, I am now ready to focus on the lower deck, and the completion of the mainline! I am hoping to have the golden spike (OK, the golden solder joint) done before our annual Doubleheaders layout tour, which is coming up in a few weeks.<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-80","post","type-post","status-publish","format-standard","hentry"],"_links":{"self":[{"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=\/wp\/v2\/posts\/80","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=80"}],"version-history":[{"count":0,"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=\/wp\/v2\/posts\/80\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=80"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=80"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.port-kelsey.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=80"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}